Post-Construction Cleaning

Final cleans scheduled to the handover date, not to a guess.

Rough, final, and touch-up cleaning for new construction, renovation, and tenant turnover — phased against the construction schedule so the space is ready when the walkthrough happens.

95%+Quality performance standard
98%+Inspection completion
<1 hrAverage response time

Why it matters

Post-construction is a deadline problem first.

Post-construction is a deadline problem before it is a cleaning problem. Dust settles in cycles, trades keep working, and a single-pass clean never survives to the punch list.

  • Written before it is delivered

    The scope for post-construction cleaning is documented area by area, with frequency and expected result, before the first service.

  • Inspected on a schedule

    Supervisors score the work against that document — not against memory or a generic checklist.

  • Reviewed with you

    Results, trends, and corrective actions are reported on the cadence agreed in your service agreement.

Post-Construction Cleaning in a commercial facility
Post-Construction Cleaning Rough, final, and touch-up cleaning that gets a space ready to hand over.

What is included

Typical scope for post-construction cleaning.

This is the starting framework. Your final scope is confirmed during the walkthrough and documented before service begins.

Rough clean

  • Debris and packaging removal
  • Gross dust removal from all surfaces
  • Initial floor sweep and vacuum
  • Site preparation between trades
  • Coordination around active work areas

Final clean

  • Detail dusting from ceiling grid down
  • Interior and exterior-accessible glass
  • Fixture, hardware, and millwork detail
  • Restroom and kitchen fixture polishing
  • Full floor treatment by surface type

Touch-up and handover

  • Second-pass dust after settling
  • Punch-list and re-work response
  • Pre-walkthrough final inspection
  • Turnover to a recurring program if needed
  • Documented completion by area

Performance standard

Post-Construction Cleaning is measured, not assumed.

72+Net Promoter Score
95%+Client retention
95%+Quality performance
98%+Inspection completion
<1 hrAverage response time
99%+Invoice accuracy

Performance documented across the facilities QS Management currently serves. Each figure is tracked through scheduled inspections, quality scores, service data, and client feedback, and reviewed with you on the cadence set in your service agreement.

Start with a walkthrough

Get a documented post-construction cleaning scope.

A walkthrough gives you a written scope, a frequency, an inspection cadence, and a response commitment — before any pricing conversation.

  • Walk the areas that post-construction cleaning needs to cover.
  • Agree the schedule, access, and service window.
  • Receive the scope in writing before pricing.
(301) 900-4223 info@qsmanagementservices.com Rockville, MD · Washington, D.C. metro
Request a walkthrough Tell us about the facility. We will confirm coverage and schedule a walkthrough.